Masi Educare Update

Steady progress is being made at Masi Educare pre-school. We last reported on the preparatory work for the delivery of new classrooms back in May. It is pleasing to see how much has been achieved in the months since then as shown by the photographs below.

Pix14092015 008

Pix14092015 010

Pix14092015 011

IMG_20150922_122017162

Pix14092015 005

As can be seen in the pictures above the walkways between the new classrooms and the main building are about two-thirds complete. Nearly all roof trusses are in place, with roof panels to be delivered by the end of this week.

Everything remains in place for the main construction to be completed by the end of October, with internal work continuing until the end of the year. Our thanks to the team on site led by Masicorp volunteer Colin Blaikie.

4 thoughts on “Masi Educare Update

  1. As a donor and good friend of Jane Philippi, it is thrilling to see the progress on the new school rooms. I’m assuming there will be some kind of dedication ceremony, and if so, let us know the proposed date as soon as possible. We would love to be able to come over for that.
    Best wishes, maureen

    • Hello Maureen. Many thanks for your interest. We are aiming to open fully in Feb 2016 and there should be a formal opening ceremony then. Please keep checking back on the blog and our other social media sites for further updates.

  2. Pingback: The Grand Opening of Masi Educare | masicorp

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s